| Sr. |
Particular |
Project
Value
(K 100 thousand) |
A/U |
Nos |
| 1. |
International Standard Swimming Pool
(North Dagon) |
2687.515 |
pool |
3 |
| 2. |
Stadium/Gymnasium (North Dagon) |
155.32 |
Stadium |
1 |
| 3. |
Padomar Stadium |
95.00 |
Stadium |
1 |
| 4. |
Myanmar Traditional Boxing Gymnasium |
966.60 |
Gymnasium |
1 |
| 5. |
Bahan play ground |
70.00 |
Ground |
1 |
| 6. |
Salin Stadium Seats and drainage |
5.37 |
Stadium |
1 |
| 7. |
Shwe Pyi Tha Stadium / Gymnasium |
211.2 |
Stadium /
Gymnasium |
2 / 1 |
| 8. |
Stadium / Gymnasium (South Dagon) |
359.5 |
- |
1 / 1 |
| 9. |
Youth Training Centre |
626.49 |
- |
3
/ 1 |
| 10. |
(a) ISPE Construction
Project
(b) ISPE Hostels
(c) ISPE Stadium / Gymnasium
(d) ISPE Archery Range
(e) ISPE School Building
(f) ISPE Indoorhall |
1103.50
688.00
85.26
27.00
122.272
390.00 |
- |
- |
| 11. |
Thanlyin Stadium |
2.4 |
Stadium |
1 |
| 12. |
Aungsan Weightlifting
Hall |
3.00 |
Hall |
1 |
| 13. |
Kandawgyi Swimming Pool |
10.00 |
Pool |
1 |
| 14. |
Theinbyu Indoor Tennis
Hall |
48.00 |
Hall |
1 |
| 15. |
National Swimming Pool
baby pool extension |
14.895 |
Pool |
1 |